What Is SASEUL? A Fair-Launch, GPU-Mined Layer 1 Explained, Five Strengths and What to Watch Next

What is SASEUL?
A coin that came out only through mining, on two ledgers. Open source and where it trades are what to watch next
Mining only
No ICO, no team share (project description)
One NVIDIA GPU
Join a pool and mine
Two ledgers
Mining picks the validators
What to watch next
Open source node software, a place to trade (Hyperliquid announced)
SASEUL (ticker SL) is a layer-1 blockchain made by ArtiFriends, a Korean company. Its mainnet launched in May 2022. It's mined through Proof of Work, and the official node software can mine with an NVIDIA GPU. According to its project description, there was no ICO or premine, and the whole supply comes from mining.
It has real strengths you can check yourself, and a few things to watch next. They are the open-source move for the node software, where SL trades, how the 9 validator seats are held, and what SL can be used for. The basic facts live on the SASEUL basic facts page.
What makes SASEUL different? Five strengths, each with a public source
All five strengths below can be checked in public sources.
| Strength | Why it matters | Source (checked October 9, 2026) |
|---|---|---|
| Fair launch, mining only | There's no locked share waiting to unlock | CoinMarketCap project description |
| One NVIDIA GPU can mine through a pool | A home PC can join | Official notice #84 (September 15, 2026), saseulmine.com |
| Two ledgers | Mining picks the validators, and the chosen validators write transactions together | Official docs, Node Overview (updated March 9, 2026) |
| Ledger running since May 2022 | It hasn't stopped since the mainnet started in May 2022, so the record goes back more than four years | Official explorer Statistics |
| A fixed point of no return | You can tell from which height a block can no longer be reversed | Official docs, Command Line Interface (updated March 9, 2026) |
Was there an ICO or premine? Not according to the project description
According to the project description, SL has never been sold. The text on CoinMarketCap says there was no ICO, IEO, private sale or public sale. It also says nothing went to the team, investors, a foundation or a treasury.
Because nothing was set aside, it says no vesting or unlock schedule exists (vesting means coins that unlock on a schedule). Keep in mind this is the project's own description, posted on CoinMarketCap. The same text says the maximum supply is 5.5 billion SL, and the amount newly issued each year shrinks to 27/32 (about 84%) of the year before.
Can you mine SASEUL with a home GPU? Yes, one NVIDIA card through a pool
Yes. One NVIDIA graphics card is enough if you join a mining pool (a group that mines together and splits the coins). The official docs say GPU mining needs an NVIDIA driver, and the node image on Docker Hub asks for driver 580 or later.
In notice #84 (September 15, 2026), the SASEUL team listed three pools. In the same notice, the team said the pools have no affiliation with it and it can't vouch for them.
One of them, saseulmine.com, sums up the steps on its front page: download the miner, paste your wallet address, press start. The full steps, including the CUDA version that fits your card, are in the mining guide. There's also a 28-day record from one graphics card on home internet.
How do SASEUL's two ledgers work? Mining picks validators, validators write transactions
SASEUL runs two separate chains. The resource chain is the mining ledger, run on Proof of Work (computers race to solve a puzzle, and the first to solve it wins). The main chain is the ledger where transactions are written.
A computer that wins at mining becomes a validator (a role that checks and signs transactions) for a set time. The official docs say this split lets throughput and consensus security scale separately. The project calls its way of reaching agreement HAP-2.
The docs also explain why SASEUL doesn't use Proof of Stake. They say proof-of-stake chains can end up dominated by the largest holders. More detail is in the two-ledgers post.
Has the ledger kept running since 2022? Yes, it hasn't stopped since May 2022
The ledger has kept growing since May 2022. The official explorer shows the first mined block at 4:55 a.m. on May 17, 2022, Korea time (May 16 in UTC). At 9:51 p.m. on October 9, 2026 (Korea time), it showed 2,341,255 resource blocks (blocks of the mining ledger).
The ledger hasn't stopped since the mainnet started. You can check the latest blocks yourself on the explorer Statistics page, and how to read it is in the block check post.
When is a SASEUL transaction final? After a fixed checkpoint about 10 blocks back
The node software marks a height after which blocks can't be reversed. The official docs call it the "Fixed checkpoint", about 10 blocks behind the latest height validators confirmed ("Committed").
On the explorer at 9:51 p.m. on October 9, 2026, the total resource blocks (2,341,255) and the confirmed ones (2,341,246) were 9 blocks apart, so the newest 9 blocks were still waiting for confirmation. The official docs say the current network reaches finality in 6 to 8 seconds.
What should you watch next? Open source, where SL trades, validator seats and uses
Here they are, with sources.
- Open-source node software: The first line of the node page on Docker Hub begins "SASEUL is not open source". The project roadmap on CoinMarketCap plans an open source transition. It says that happens if no further patching is judged necessary after the hard fork (the big update to node software version 2.3, which can't run alongside older versions; see the hard fork post), and the date isn't fixed. Open source isn't what makes a coin safe or unsafe on its own, so this is just something to follow
- Where SL trades: BitMart, the only listing confirmed by an official notice (May 9, 2025, notice #65), stopped all trading on August 26, 2026 (BitMart post). On October 19, 2026, official notice #85 said SL was expected to become available for spot trading on Hyperliquid, a decentralized exchange, within about 72 hours. Details are in the notice post
- Validator seats: A main block is valid with signatures from 6 of the 9 current validator seats, per the project description. On the explorer at 9:51 p.m. on October 9, the 9 seats were held by 6 different addresses
- Uses: What SL can be used for today is in this post
So what can you do? Check the strengths yourself and watch the official notices
- Open the explorer Statistics page. "Genesis Mining" (the time of the first mined block) and "Confirmed Resource" (resource blocks confirmed so far) let you check two of the strengths in a minute
- Follow listing and open source news only on the official Telegram notices. You can read them on the web without an account
- To see whether the node software opens up, watch the first line of the Docker Hub page
- If you'd like to mine, follow the mining guide. Starting light with a spare NVIDIA card seems like the sensible way in to me
Sources
- CoinMarketCap · About SASEUL and roadmap (layer 1 by ArtiFriends, mainnet since May 16, 2022, never sold, no ICO/IEO/sales, no team/investor/foundation share, no vesting, max 5.5 billion SL, 27/32 a year, 6 of 9 validator signatures, "Open Source Transition" on Dec 31, 2026 with no fixed date) · project's own description, checked 2026-10-09
- SASEUL Docs · Node Overview (two chains, HAP-2 built on Proof of Work, why not Proof of Stake, GPU mining needs NVIDIA driver, 6 to 8 second finality) · updated 2026-03-09, checked 2026-10-09
- SASEUL Docs · Command Line Interface (Committed, Fixed checkpoint about 10 blocks behind) · updated 2026-03-09, checked 2026-10-09
- Official SASEUL explorer · Statistics (Genesis Mining 2022-05-17 04:55:12 KST, Total Resource Blocks 2,341,255, Confirmed Resource 2,341,246, Validators V1 to V9 with 6 different addresses) · checked 2026-10-09 21:51 KST
- saseulmine.com front page ("Unofficial community pool", download, paste address, start) · checked 2026-10-09 21:51 KST
- Docker Hub · artifriends/saseul-network (first line "SASEUL is not open source", GPU mining needs NVIDIA driver 580 or later) · checked 2026-10-09
- Official SASEUL Telegram notice #84 · mining pools · 2026-09-15, checked 2026-10-09
- Official SASEUL Telegram notice #65 · BitMart listing on 2025-05-09 · checked 2026-10-09
- Official SASEUL Telegram notice #85 · SL on Hyperliquid (spot trading on Hyperliquid expected within about 72 hours) · posted 2026-10-19 19:04 KST, checked 2026-10-19
- BitMart stopping all trading on August 26, 2026: as checked in this blog's BitMart post on 2026-09-27
This is one writer's view, not investment advice. I hold SL. I opened the official docs, explorer and notices, Docker Hub, saseulmine.com and the CoinMarketCap project description myself on October 9, 2026, and the Hyperliquid notice on October 19, 2026.